Stud is 5-1/2" and plywood is 7/16".
So to get the open edge of the box flush with the face of the plywood, it has to be 5-15/16" from the 2x4 it was previously attached to. But I'll round it up to 6" because two layers of paper backing on the insulation will be between the studs and the plywood.
Box is 1-¾" deep. Or 1.75.
2x4's are 1.5" thick. Two of them = 3". So with two 2x4's the box is now at 4.75". Needs to be 6", so I got 1.25" to go.
So mill a 2x4 down to 1.25 inches..
So with the planer I milled the third 2x4 to 1-¼.
Put it together and pulled a tape measure on it and it's fucking dead on 6 inches from the 2x4 behind the studs.
Then I put the stud in, and set a straight edge in there and the damn thing was flush with the stud, not sticking out another half inch like it's supposed to.
Somehow the stud got wider or the 2x4 shims got thinner...
Nope... Tape measure doesn't lie and the stud is 5-1/2" deep and the box it 6"... So it should stick half an inch past the stud.... But of course, it doesn't.
And the straight edge is of course, straight.
So WTF'ing F??
So I sez fuck it & put washers between those two pieces to bring it even further out.
All that matters is what it looks like when it's done.
But I can't do anything else til I get more plywood and insulation from Menard's and those bastards are closed tomorrow.
