

Why don't you build a ramp like the Egyptians did when building a pyramid?

you know buddy, you say, "pain in the ass"..when frankly, you created it.Go to the dictionary and look up "pain in the ass" and you'll see this:
View attachment 38492
But I already managed to get SEVEN 12 gauge solids through this thing:
View attachment 38493
It's feeding the air compressor switch which requires 4 wires, (two feeds, two loads returning to the box) an extra hot, common and ground so I can also have an outlet in this little stub wall, on a different circuit.
View attachment 38494
I like doing all that stuff myself. Even if I'm bitching the whole time.you know buddy, you say, "pain in the ass"..when frankly, you created it.
you gave us a "price update" mon the costs so far. not fully aware of your labor rates up there, i'd venture to guess, around an additional $500 would have paid for a professional electrician for his labor only (you supply the parts), and it would have all been done in one day, and with in code.
i applaud your efforts, but when i have read thru the zillions of posts about this project, many things could have been "farmed out" to pro's, and you could have slid into a more comfortable situation, sooner, rather than later.

there is the "pride factor" to be taken into consideration in being to be able to do something yourself.you know buddy, you say, "pain in the ass"..when frankly, you created it.
you gave us a "price update" mon the costs so far. not fully aware of your labor rates up there, i'd venture to guess, around an additional $500 would have paid for a professional electrician for his labor only (you supply the parts), and it would have all been done in one day, and with in code.
i applaud your efforts, but when i have read thru the zillions of posts about this project, many things could have been "farmed out" to pro's, and you could have slid into a more comfortable situation, sooner, rather than later.
frankly, that's the way i am as well with some projects.I like doing all that stuff myself. Even if I'm *****ing the whole time.![]()
look at the truckers on here that take on repairs that could have been done quicker by professionals but tae pride in their accomplishmentsthere is the "pride factor" to be taken into consideration in being to be able to do something yourself.
i take pride, lots of pride, in the sammiches i make for lunch. i'd make Dagwood Bumstead jealous...look at the truckers on here that take on repairs that could have been done quicker by professionals but tae pride in their accomplishments
I don't do ceilings, dig up sewer stuff, drywall.frankly, that's the way i am as well with some projects.
i just don't touch electrical, plumbing, framing, carpentry, masonry, window glazing, painting, wall papering, or refrigerator repairs....
everything else, i do....

i do plaster repairs. my house has the old horsehair plaster walls. i do ceilings and the walls.I don't do ceilings, dig up sewer stuff, drywall.
I did an entire wall in a shed once in drywall. Taped and mudded, sanded it down and painted.
It was perfect.
Two weeks later there were cracks in every seam.
Turns out it was because the shed was built on cinder blocks.