That is what I was wondering. It's their plates etc. But as a contractor they can't dictate what you do with your equipment otherwise you would be an employee.
I am wondering why they are prohibiting PC for a better understanding of are they violating your independent contractor status.
It's their plate but we pay for it and the bobtail/liability insurance. And some guys run their own plate. IOW I could reactivate my Pennsylvania plate and run that instead.
Apparently some guys are abusing PC and violating the law.
They also had in their heads that they could limit how much time we use it for. I would get emails from the idiot in safety that more than an hour is a log violation. Just got one this past Friday actually.
She also calls out Yard Move with the Pretrip comment a log violation.
She also told me I had to put Break as a comment for a span of time that satisfies the 30 minute requirement. Took some arguing to educate her that it's not a break, it just qualifies as one. 30 minutes On Duty for a Drop and Hook is still a break but you don't label it a 30 minute break because you're not off duty.
Not to mention comments themselves aren't actually required anymore.
Nor are DVIRs with no faults. Couldn't explain to her that a DVIR and a Post Trip are two different things. Her boss had to contact a DOT officer to get it explained to HIM because he didn't know the difference either. She kept violating me for not having a post trip when it's right there on the log. Not that those are actually required to be logged either.
XPO/STG is such a mess. This is why I left the first time around. Now they remove PC and I'm further pushed over the edge.
Just leave me alone, people. You don't know WTF I'm doing but I do.