Duck Pond Redneckery


So my friend wants me to flip houses.

Says the average flip nets a profit of 25-40 grand.

I told him I can't survive on a measly ten grand a year.

He didn't get the joke. ;)
id'e ask my friend how he expects you guys to buy the houses cash or mortgage:confused-96:... the last thing i would want is a mortgage hanging over my head while waiting for it to sell:stare1:
 
id'e ask my friend how he expects you guys to buy the houses cash or mortgage:confused-96:... the last thing i would want is a mortgage hanging over my head while waiting for it to sell:stare1:
That's not an issue for me but what I don't get is how he is gonna provide half the labor. He wants to partner up.

Between the two of us we've got all the tools & skills.

He's a nurse, and he's in the marine reserves and has to do his weekend warrior stuff. He's also got a wife and two kids. Where's he gonna get the time and the energy?

I don't think he's planning on quitting the nurse thing.

It took him two years to rehab the gutted foreclosure he's living in now, but it's right down the street from his dad, and his dad isn't a tired old couch potato like mine, and I suspect he did a large portion of the work himself while Matt was at work.
 
I could get this stuff done fast if I didn't give a fuck. That's what house flippers do. Just a quick half-assed job, git R dun. Sucks to be the buyer..

If you do home repairs, your work is immediately scrutinized by the customer AND it has to be done quickly because nobody likes having strangers in their houses any longer than they have to. Especially if they have an aggressive dog they have to keep locked in another room the whole time.

House flippers get away with all kinds of half-assed work because the buyer ain't gonna be there watching the whole time you're doing it.

Shortly before my dad sold the old house, but after he bought the farm house, the bathroom sink drain started leaking. Water was coming out of the wall.

We tore out the wall and found that the old iron pipe was rusted all the way through right where it enters the cement slab the house was built on.

We would've had to chop out the floor and remove & replace a load bearing wall to do it right.

Instead I simply surrounded the break with silicone, then built a little box around it with cardboard and duct tape, and filled the box with Quick-crete. After it set, I removed the cardboard and surrounded the bottom with more silicone.

Then we replaced the drywall, spackled and sanded. Then painted the whole bathroom so it wouldn't be obvious any work was done recently.

It didn't leak, so my dad never told the buyer about it. ;)


If it was me though (my house, my integrity at stake), I'd have gone ahead and removed part of the wall framing, and used a concrete saw to cut out a perimeter, chop it up with a handheld air chisel and exposed some good pipe to cut & thread & replace everything from there to the sink with new pipe. Fill in the hole with quick-crete and blah blah blah.

But it would take 4 times as long.

That's the problem. I refuse to half ass anything I do. If I did that, I wouldn't be able to make fun of the pathetic excuses for what passes as "professionals" today.
 
20170115_002839-jpg.38228


Eventually, some day, that's going to be where the wire exits the workshop to feed power to the chicken coop. I'm just putting the conduit through the wall now because it'll be a huge pain in the ass to do it later once the wall is covered and insulated.

20170115_151802.webp

20170115_162343.webp

20170115_154448.webp
 
If your going to make a work bench a good one is to glue and screw 2x4's together. You do need a surface planner though. Glue up enough to fit through the planner then glue them all together. Makes a real sturdy bench. When I had a wood shop I made mine with maple 4x4's. A little over kill.
 
That's not an issue for me but what I don't get is how he is gonna provide half the labor. He wants to partner up.

Between the two of us we've got all the tools & skills.

He's a nurse, and he's in the marine reserves and has to do his weekend warrior stuff. He's also got a wife and two kids. Where's he gonna get the time and the energy?

I don't think he's planning on quitting the nurse thing.

It took him two years to rehab the gutted foreclosure he's living in now, but it's right down the street from his dad, and his dad isn't a tired old couch potato like mine, and I suspect he did a large portion of the work himself while Matt was at work.
Simple. He is going to bandage you up when you hurt yourself putting in the labor.:D
 
If your going to make a work bench a good one is to glue and screw 2x4's together. You do need a surface planner though. Glue up enough to fit through the planner then glue them all together. Makes a real sturdy bench. When I had a wood shop I made mine with maple 4x4's. A little over kill.
Oh you mean one of these? ;)

20170115_232625.webp
 
All that's left to wall up is this. The most complicated mess...

20170116_164150.webp

I'm going to to have to move two 240 outlets, one 120 outlet, make an inspection box, work around an air hose, two switches and the fact the breaker box is not set out far enough to be flush with the plywood nor is it even straight. And it cannot be moved easily because of the 9 conduits coming out of it. And I also gotta leave room for expansion. And after making a zillion cutouts and notches in the studs, somehow make it strong too.

Dunno at this point. But right now I'm working on figuring out how to get a stud in there without cutting the horizontal 2x4 that is totally in the way...

20170116_164216.webp
 

Back
Top