What are those boards for? Header for a drop ceiling? Header for ceiling joists?
It's for the perimeter of the drop ceiling.
Flimsy L channel goes on it. It's like angle iron but it's just sheet metal.
Gotta get that L stuff around the perimeter then start hanging the T channel grid.
Each one is 12 feet long, and not strong enough to hold its own weight when I'm holding it from one end. So it's going to be a pain in the ass. Hang it from a bungee cord in the middle, attach one end, then hang it from wires every 4 feet. Every wire has to hold it exactly 6-1/2" below the rafters.
After the T channels are run north &south, two footers every 4 feet hold them parallel & a few strategically placed ceiling panels hold the grid square.
The only way I can do all that by myself in less than a year would be if I can get wheels on my scaffolding. I must've climbed up & down the ladders to move them 50 times just doing the electric. The electrician who did the initial install used my scaffolding. But when he needed to move it, he had a helper.
I can either go get some steel to replace the worthless iron I thought was steel until I tried welding it to make brackets for putting casters on my scaffolding, or just have the metal fabricator down the street do it while I work on the electric.
I still need to add 9 more outlets for the lighting.
I had plenty of lighting in there but half of it was clamp-on work lights and extension cord kinda temporary crap but now that I'm putting in an insulated ceiling I have to do it right.
I already redid everything the electrician did, just to move the 4 outlets south. The north two went 4 feet south because they were right up against the pallet rack. The other two were in the center but I moved them 8 feet south.
I'm not good with bending conduit but this was all straight pieces.
But 4 lights ain't enough.
The white ceiling will help scatter the light and brighten up the place a lot so I don't know if I really need 13 lights but whatever ..
It's all 12 gauge wire on a 20 amp circuit.
At 125 volts that's 2500 watts available but I'll probably have it lit up bright as day on 351 watts using the 27 watt (100 watt equivalent) CFLs. But it'll be even less than that because the ones over the tool boxes and workbench will be 7 watt LEDs . They're expensive but just as bright as the 27 watt CFLs. But the CFL lights take about 5 minutes to reach full brightness in the cold. And most of the time I'll just be going in just to grab something out of a toolbox so I'll have the LEDs because they're instantly full brightness like incandescent bulbs. But since they'll be 13 feet up, I'll use LEDs because they supposedly last like 20 years.
Blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah blah . . .