EC's Going For It


Down here in Floriduh, they finally started putting radials on the chassis for intermodal work. It seems the carriers were spending far too much time on the side of the road with blowouts on the recraps and bias tires and the loads weren't getting to where they needed to be on time.
 
There's talk of suppliers refusing to inventory replacement bias plies. I don't know if that's rumor or if there's any truth to it, but it sure would be nice. If they don't exist, they can't buy them.

You can't hardly hope for manufacturers to stop making them. As long as there's a china, they will be made.
 
Had a nice conversation with the dispatcher/manager and she says I'm on par with everyone else productivity and revenue wise running at 62 in my day cab.

So no need to run my guts out like they do.

IOW I'm not "that damned day cab guy" who's frustrating to dispatch.
 
When I run 70-75 instead of 62 I lose 1.5-2mpg. That's $400 a week average.

That's a big hit when it doesn't save enough time to run extra loads. It's $400 spent literally for nothing.

At 70+, especially on hot days, the odds of an old bias ply blowing out skyrocket. And sitting for road service wastes more than the time you made running fast.

Not to mention the stress and piss poor handling of a day cab yanking a spring ride at higher speeds.
 

Back
Top